Green Energy Now: 96 percent increase in stationary orders in 2023 | 25th Follow-up order from “DB Bahnbau Gruppe” for Proton Motor hydrogen fuel cell system

On 28 June 2024, the listed Proton Motor Fuel Cell parent company, Proton Motor Power System plc (Link directly to RNS_Final Results 2023), announced the audited results for the year ended 31 December 2023. As a highlight, it should be mentioned that there was a notable shift in demand to stationary applications which comprised 96 percent of order intake in 2023 (2022: 59 percent). Sales in 2023 were GBP 2,122k (2022: GBP 2,088k), representing an annual increase of 1.7 percent. Due to progress in the delivery of the new production facility, the commissioning of the new second Proton Motor site in Fuerstenfeldbruck in the Munich metropolitan region is planned for 2025.

DB Bahnbau Gruppe orders the 25th Proton Motor system since 2015

On 25 June 2024, Proton Motor received a new order from DB Bahnbau Gruppe GmbH for the complete hydrogen fuel cell emergency power system “HyCabinet® S24”. This follow-up order represents the 25th system since the co-operation between Proton Motor and DB Bahnbau Gruppe was signed in 2015. The HyCabinet® product will be integrated into the same railway control centre as the system that was handed over on the 16 May 2024 in the greater Berlin area. Both systems can be operated independently of each other for a total rated power output of 48 kW.

Caption: The graphic shows the installation layout of the emission-free emergency power supply in the Bahnleitstelle._(c) Proton Motor